PURPOSE OF ASSIGNMENT

 

The purpose of this assignment is to enable you to:

  • Understand and apply the theory and principles of project procurement strategies to complex projects
  • Apply the principles of tender evaluation for built environment projects

 

 

ASSIGNMENT TASK

 

Assume that you are currently working as the in-house Contract Administrator for your employer. You have received three tenders for an outdoor public pool project, the Eastern Beach Pool*. The project will be delivered using traditional procurement route and an “open single-stage tendering” method will be adopted.

Your task is to analyse the bids submitted by the three tenderers, A, B and C and prepare a detailed tender evaluation report for your employer. The tender evaluation report should include the evaluation of tenders, ranking of the tenderers, reasoned recommendations for a suitable contractor. The report should also include other important details that are generally included in a tender evaluation report, such as project scope, tendering method, selection criteria, tendering process, etc.

A summary breakdown of the tender prices submitted by each tenderer is given on the next page. You are required to prepare detailed and reasonable profiles** (imaginary) for each tenderer to enable you to extract the necessary information needed for the tender evaluation. These details include (but not limited to) tenderer’s technical, financial and managerial capacity, experience, current commitments, etc. This information will be required for the preliminary and qualitative evaluation stages of your tender evaluation and you should attach it to the tender evaluation report as an appendix.

* A site plan and a proposed pool plan can be found here. The documents can also be found in the “Assessment” folder in DeakinSync > CloudDeakin > SRQ780. These documents should only be used for the assignment purposes and should not be distributed or uploaded to any internet repository. 

**tenderer profiles show company-specific information required for this evaluation. 

 

 

SRQ780 Strategic Construction Procurement                                                                                                                                                         Assessments

Summary breakdown of tender prices

Item     Tenderer A Tenderer B Tenderer C
Demolition     350,500 300,000 380,000
Structure     2,550,000 3,005,000 2,800,000
Brickwork & Blockwork     100,000 102,500 110,000
Structural Steelwork     120,000 110,000 150,000
Curtain Walling & Glazing     985,000 950,000 894,500
Carpentry works     398,000 301,000 399,500
Hydraulics     500,000 450,000 395,200
Electrical     300,000 410,300 279,500
Fire Protection     352,000 400,000 386,500
Mechanical     555,555 550,000 450,020
Lifts     1,010,000 1,200,500 1,080,000
Partitions & Susp Ceilings     150,000 150,000 145,000
Carpet Supply & install     210,000 300,000 351,000
Painter     95,000 94,500 102,450
    Total 7,676,055 8,323,800 7,923,670

 

 

 

 

 

 

 

 

Assessments

FORMAT OF ASSIGNMENT

  • The assignment is to be submitted in report format and as such should have a formal structure and layout. It should be presented as a neat, tidy and professional electronic document. It requires a title page, introduction, table of contents, body text, conclusion, references and annexes (tenderer profiles and workings of tender evaluation).
  • The report should not exceed 4,000 words, excluding title page, introduction, table of contents and annexes.
  • The assignment should be presented as a single PDF document

 

ASSIGNMENT SUBMISSION

  • Students MUST submit the completed report as an individual into the designated Assignment Dropbox on the unit site.

 

ASSIGNMENT CRITERIA

A detailed rubric is provided on the next page

 

 

SRQ780 Strategic Construction Procurement                                                                                                                                                         Assessments

ASSESSMENT CRITERIA OF ASSIGNMENT

HD D C P N Marks
Preparation of tenderer profiles        
All required contents are included in the tenderer profiles, very well detailed, appropriate and accurate. Most of the required contents are included in the tenderer profiles, well detailed, appropriate, but may contain minor errors and/or omissions. Reasonable contents are included in the tenderer profiles, reasonably detailed, appropriate, but there are errors and/or omissions. Basic contents are included in the tenderer profiles with basic attention to details and appropriateness. There are errors and omissions. Contents included in the tenderer profiles are poor with poor attention to details,

appropriateness and accuracy.

15
Preparation of project scope and selection criteria        
An excellent identification of project scope and selection criteria. A very good identification of project scope and selection criteria. A good identification of project scope and selection criteria. A satisfactory identification of project scope and selection criteria. Inadequate identification of project scope and selection criteria. 15
Preliminary and detail tender evaluation        
Excellent understanding and knowledge demonstrated on preliminary and detailed evaluation against selection criteria. Good understanding and knowledge demonstrated on preliminary and detailed evaluation against selection criteria. But may contain minor errors and/or omissions. Sound understanding and knowledge demonstrated on preliminary and detailed evaluation against selection criteria. But there are errors and/or omissions. Basic understanding and knowledge demonstrated on preliminary and detailed evaluation against selection criteria. There are errors and/or omissions. So need further clarification and details. Poor understanding and knowledge demonstrated on preliminary and detailed evaluation against selection criteria. 50
Reasoned recommendations of a suitable subcontractor        
Excellent recommendation of a suitable subcontractor and

very well justified the selection.

Good recommendation of a suitable subcontractor with a valid justification. May contain minor errors and/or omissions. Sound recommendation of a suitable subcontractor with a reasonable justification. There are errors and/or omissions. Recommendation of a suitable subcontractor provided with a basic or poor justification. There are errors and omissions. So need further clarification and details. Poor or no recommendation of a suitable subcontractor with poor or no justification at all. 10
Presentation & structure of tender evaluation report and appendices        
Report is excellently presented in a professional manner, following clear and logical structure. Correctly referenced. Report is presented to the required standard following a clear and logical structure, but some minor errors in areas such as the use of English, spellings, grammar, layout, overall visual presentation and/or and clarity of expression. Correctly referenced. Report is fairly presented to the required standard, but errors in areas such as structure of the report, the use of English, spellings, grammar, layout, overall visual presentation and/or and clarity of expression. May include errors in referencing. Report is presented to a basic standard. Contains errors in areas such as structure of the report, the use of English, spellings, grammar, layout, overall visual presentation and/or and clarity of expression. May include errors in referencing. Report is poorly presented and structured. Contains many errors in areas such as the use of English, spellings, grammar, layout, overall visual presentation and/or and clarity of expression. May include errors in referencing. 10
Total       100

 

Assessments

 

PURPOSE OF ASSIGNMENT

The purpose of this assignment is to enable you to:

  • Understand and apply the theory and principles of project procurement strategies to complex projects.
  • Develop an understanding for a complex public project procurement and identify critical success factors for efficient procurement of projects.

 

ASSIGNMENT TASKS

 

Case study outline

Consider the recently completed Sydney Light Rail Project and the ongoing Westgate Tunnel project as your case studies

 

Preliminary sources for Case Study  

The following links will be helpful for you to learn the background information of this project. However, you are expected to refer to other sources (including journal articles) beyond these links in completing this assignment.

 

Sydney Light Rail: 

  • Official contract document, link
  • Project Overview, Acciona, link
  • NSW Auditor General’s Report, link

 

Westgate Tunnel Project:

  • Project overview and updates, link
  • Project Agreement, link
  • Update on project issues and dispute, Link 1 and Link 2

 

Task 1

In groups of 4 students each, conduct a review of the two case studies to

  1. Provide a brief overview of the project objectives and characteristics
  2. Review the procurement methods used of the projects. Discuss the suitability, or otherwise, of the chosen procurement methods for the projects.
  3. Undertake a critical analysis of the procurement challenges encountered on these projects

 

Task 2

In the same groups of 4 students each

  1. Both of these case study projects have been reported to experience significant cost overruns with the Sydney Light Rail being completed very late as well. Propose possible procurement strategies and approaches that could have been adopted by the client to avoid or minimise the impact of the problems encountered.
  2. Outline and discuss the weakness and impact of poor risk management on both projects.
  3. Propose 2 key procurement “lessons learnt” (or “take-home messages”) from your analysis of the two projects that should be taken into consideration on future projects.

SRQ780 Strategic Construction Procurement                                                                                                                                           Assessments

GROUP REQUIREMENTS

  • Students are to work in a group of 4. Details on group formation will be provided on the unit site and during the Bb Collaborate sessions.
  • Group members should communicate with the Unit Chair well in advance, prior to submission, if there are any group conflicts that cannot be resolved within the group.

 

FORMAT OF ASSIGNMENT

  • The assignment is to be submitted as a well-referenced report and as such should have a formal structure and layout. It should be presented as a neat, tidy and professional electronic document. It requires a title page, introduction, table of contents, body text, conclusion and references.
  • The report should not exceed 5,000 words, excluding title page, table of contents, references and annexes.
  • The assignment should be presented as a single PDF document

 

ASSESSMENT SUBMISSION

Students MUST submit the completed report as a group into the designated Assignment Dropbox on the unit site.

 

ASSIGNMENT CRITERIA

A detailed rubric is provided on the next page

Page 10 of 11

 

 

SRQ780 Strategic Construction Procurement                                                                                 

                                                                                                                                                                                                                                                                                               Assessments

ASSESSMENT CRITERIA OF ASSIGNMENT

HD D C P N Marks
Identification of project objectives and project characteristics (Task 1a)        
An excellent identification of project objectives and characteristics. A very good identification of project objectives and characteristics. A good identification of project objectives and characteristics. A satisfactory identification of

project objectives and characteristics.

Inadequate identification of project objectives and characteristics. 10
Evaluation and review of procurement method (Task 1b & c)        
An excellent evaluation and review of the adopted procurement method, including an excellent analysis of the challenges encountered on the projects. An very good evaluation and review of the adopted procurement method, including a very good analysis of the challenges encountered on the projects. A commendable evaluation and review of the adopted procurement method, including a commendable analysis of the challenges encountered on the projects. A basic evaluation and review of the adopted procurement method, including a satisfactory analysis of the challenges encountered on the projects. A poor evaluation and review of the adopted procurement method, including a poor analysis of the challenges encountered on the projects. 20
Procurement Strategies (Task 2a)        
An excellent discussion of procurement strategies for effective delivery of the case study projects.  The discussion demonstrates an extensive and excellent knowledge of complex project procurement. A very good discussion of

procurement strategies for effective delivery of the case study projects.  The discussion demonstrates a very good knowledge of complex project procurement.

A commendable discussion of procurement strategies for effective delivery of the case study projects.  The discussion demonstrates a good knowledge

of complex project procurement.

A satisfactory discussion of procurement strategies for effective delivery of the case study projects.  The discussion demonstrates a basic knowledge of complex project procurement. A poor discussion of procurement strategies for effective delivery of the case study projects.  The discussion demonstrates a rather poor knowledge of complex project procurement. 20
Risk Management (Task 2b)        
An excellent appraisal of the weaknesses and impact of poor risk management on the case study projects A very good appraisal of the weaknesses and impact of poor risk management on the case study projects A good appraisal of the weaknesses and impact of poor risk management on the case study projects A satisfactory appraisal of the weaknesses and impact of poor risk management on the case study projects A poor appraisal of the weaknesses and impact of poor risk management on the case study projects  20
Lessons Learnt (Task 2c)        
Excellent and practical Lessons Learnt recommendations that are supported by the analysis undertaken Very good and practical Lessons Learnt recommendations that are supported by the analysis undertaken Satisfactory Lessons Learnt recommendations that are supported by the analysis undertaken Satisfactory Lessons Learnt recommendations Poor and likely impractical Lessons Learnt

recommendations for future projects

 20
Presentation of report and referencing        
The report is excellently presented in a professional manner, following a clear and logical structure. Correctly referenced. The report is presented to the required standard following a clear and logical structure, but some minor errors in areas such as the spellings, grammar, layout, overall visual presentation and/or and clarity of expression. Correctly referenced. The report is fairly presented to the required standard, but errors in areas such as the structure of the report, spellings, grammar, layout, overall visual presentation and/or and clarity of expression. Referencing may or may not be correct. The report is presented to a basic standard and contains errors in areas such as the structure of the report, spellings, grammar, layout, overall visual presentation and/or and clarity of expression. May include errors in referencing. The report is poorly presented and structured and contains many errors in areas such as spellings, grammar, layout, overall visual presentation and/or and clarity of expression. May include errors in referencing. 10
Total       100

 